Trade-off Calculations for Above-ground Building Envelope Assemblies | |||||||||||||||
Description or Identification of Building Envelope Assembly | Opaque Portions | Fenestration Portions | Area of Assembly in Reference Building: Air, (m²) | Area of Assembly in Proposed Building: Aip, (m²) | Minimum Allowable Thermal Resistance of Assembly in Reference Building (prescriptive values): Rir (m²•K)/W | Thermal Resistance of Assembly in Proposed Building: Rip (m²•K)/W | Air / Rir (W/K) | Aip / Rip (W/K) | |||||||
Wall | Roof | Floor | Fenestration | Door | Skylight | ||||||||||
Fenestration Trade offs are limited to fenestration on the same elevation. Please indicate which elevation contains the fenestration being calculated |
|
||||||||||||||
RSI | R | RSI | R | ||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
0.00 | 0.00 | ||||||||||||||
TOTALS: | |||||||||||||||
Is building envelope compliant with simple trade-off path? (Aip / Rip < total Air / Rir and Aip = Air ) | |||||||||||||||
YES | |||||||||||||||
NOTES: | |||||||||||||||