Trade-off Calculations for Above-ground Building Envelope Assemblies
Description or Identification of Building Envelope Assembly Opaque Portions Fenestration Portions Area of Assembly in Reference Building: Air, (m²) Area of Assembly in Proposed Building: Aip, (m²) Minimum Allowable Thermal Resistance of Assembly in Reference Building (prescriptive values): Rir (m²•K)/W Thermal Resistance of Assembly in Proposed Building: Rip (m²•K)/W Air / Rir (W/K) Aip / Rip (W/K)
Wall Roof Floor Fenestration Door Skylight
Fenestration Trade offs are limited to fenestration on the same elevation. Please indicate which elevation contains the fenestration being calculated
RSI R RSI R
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
TOTALS:
Is building envelope compliant with simple trade-off path? (Aip / Rip < total Air / Rir and Aip = Air )
YES
NOTES: